A new beginning
30 November, 2013 Leave your thoughtsIt ‘been a long process that, since 1998, the year when the design team for the new hospital in Alba-Bra has been formed, characterized the birth and development of the project and the construction site.
To be honest, the idea of a new hospital between Alba and Bra is not recent, it has almost 20 years, because the analysis of the health situation required a strengthening and integration of existing structures. In this view has been advanced the hypothesis of a unique hospital for Alba and Bra, in a central position between the two cities.
In 1999, it has been approved the preliminary draft developed by a design group whose team leader was Arch. Aymeric Zublena of the Studio SCAU of Paris and the local contacts were the Studio Dellapiana of Torino and the Studio Camerino of Venice.
Today, with great difficulty, in the construction site of Verduno, the realized part is about 55% of the total, and finally, after a 18-months-stop and a variety of problems, works are resumed and the completion date is scheduled for September 2015.
Finally, because the project, which the design team, including ARCHICURA, has followed with difficulty and effort, is a high-level design.
The organization and atmosphere of the rooms has been particularly studied to obtain the maximum comfort for the patients and to offer a continuous contact with the outdoor landscape.
Particular attention has been paid to materials (glass broad and transparent, copper and wood that contribute to creating living and cozy spaces).
It ‘s time to see the closure of the session, both for those who have worked with passion to the project, both for those who will benefit because it will, without a doubt, a hospital where you will be fine.
Categorised in: News
This post was written by archicura
Comments are closed here.